Batching plant with aggregates loading system with scraping radius. Mixing system with planetary mixer at forced speed
Bottom and sides of the tank in interchangeable wear-resistant panels
Shovels in special wear-resistant alloy Ny-Hard CH3
Alloy cast iron Ny-hard CH3
Unloading door complete with oil-dynamic cylinder
The aggregates are batched in a hopper with nr.3 loading cells whereas the cement is weighted separately from the aggregates in one batcher with nr. 1 loading cell
Water dosing system with liters-counter
Electro-mechanical emergency with carter and tearing cord
Control panel manual/automatic 300 formulas
TECHNICAL DATA | 750 | 900 | 1200 | 1600 | 1800 | 2200 |
---|---|---|---|---|---|---|
Support structure 3 stages | 1 | 1 | 1 | 1 | 1 | 1 |
Fresh concrete | 500 | 600 | 800 | 1000 | 1250 | 1500 |
Hourly production | 12-14 | 14-16 | 22-24 | 28-30 | 32-35 | 38-40 |
Trestles for security perimeter indications with galvanized bolts and nuts | 1 | 1 | 1 | 1 | 1 | 1 |
Ladder, ballatory and parapets | 1 | 1 | 1 | 1 | 1 | 1 |
Aggregate hopper with 3 laoding cells | 1 | 1 | 1 | 1 | 1 | 1 |
Weight cement batcher | 220 lt. | 250 lt. | 400 lt. | 450 | 570 lt. | 650 lt. |
Water tank | 165 lt. | 300 lt. | 300 lt. | 300 lt. | 300 lt. | 300 lt. |
Water dosing system with liter-counters | 1 | 1 | 1 | 1 | 1 | 1 |
Weight additives | 6 lt. | 6 lt. | 6 lt. | 6 lt. | 12 lt. | 12 lt. |
Scraping radius | 28 cups | 35 cups | 36 cups | 42 cups | ||
Translator with laoding and unloading with sensor of restarting cycle | OPTIONAL | 1 | 1 | |||
Compressor | 100 lt. | 100 lt. | 100 lt. | 100 lt. | 100 lt. | 100 lt. |
Air distribution system with pipelines | 1 | 1 | 1 | 1 | 1 | 1 |
Water pump | 1 | 1 | 1 | 1 | 1 | 1 |
Control cabin with printer 22 colums | Manual/Automatic 300 recips | |||||
Silos | 1 | 1 | 1 | 1 | 1 | 1 |
Cement screw | Ø 193 | Ø 193 | Ø 193 | Ø 219 | Ø 219 | Ø 219 |
Ground filter | 1 | 1 | 1 | 1 | 1 | 1 |
Basket | 1 | 1 | 1 | 1 | 1 | 1 |
Air bucket | 400 lt. | 600 lt. | 1000 lt. | 1200 lt. | 1400 lt. | 1600 lt. |
Command post boarding plant | 1 | 1 | 1 | 1 | 1 | 1 |
1 Scraping radius for 1 aggregate | 2 Scraping radius for 1 aggregate | |||||